Mechanical and Public Health Services including BMS
Systems:
Full Refurbishment of existing Air Handling Units while the building is occupied
Replacement Ventilation Fans while the building is occupied
All new on floor VAV systems levels 1 to 5 inclusive.
New 2-pipe Fan Coil Units lower ground floor
New chilled water to serve Lower ground floor
Smoke Ventilation Systems
New Domestic Hot & Cold Water Services and PH Services
BMS Controls System for the new VAV systems
Migration of the existing Siemens BMS system to Trend with a new headend including upgrading the Controls panels.
Ductwork cleaning of the entire building
Challenges: Coordination of Services due to building constraints & architectural requirements Upgrading of existing systems while the building is occupied without disruption to the users.