Case Study

The Smithson

The Smithson building in Farringdon was refurbished to high quality office accommodation.

All new building services were installed, using a heat recovery ventilation system to provide fresh air, and underfloor 4-pipe heating and cooling system utilising gas fired boilers and chillers to the office space. Central pipework and ductwork were retained with modification.  Installation carried out within restricted floor void.

Project gallery